In my data studio dashboard i have team size filter. This team size column contains(in google sheets) few types of team sizes(0-1,2-5,501-1000 ... ). My problem is when i add a filter using this team size column it shows date ranges(some of data). 2-5 team size shows as 2020-02-05 likewise. Data type for team size is string in data studio.
Data studio filter - some of String data converting to date range automatically
282 views Asked by Hashan Dananjaya At
1
There are 1 answers
Related Questions in GOOGLE-SHEETS
- google sheets, search and replace for next colum
- AppScript to replace image in google slides
- Regex to match repeated substring in Google Sheets
- How to append row to specific columns with gspread?
- Find a value in a range of cells (multiple rows and columns)
- Create date column based on range
- Look up a value using month of the date
- Data recovery based on other data
- Gsheet - Automatically send an email using a date & time in a Cell
- google sheet script to convert the Scientific notation in the selected area to number
- How can I limit the number of dropdown entries in a column in Google Sheets
- Parse tag in html via Google Sheets (importxml)
- Why is the background color of my google sheet web app not being applied?
- Google Sheets script that automatically locks a sheet 24 hours after a cell is edited
- My Google Sheets formulas mysteriously break as time passes, fix themselves when refreshed
Related Questions in LOOKER-STUDIO
- Looker Studio | pivot chart - sorting by metric and last month
- How do I export a dashboard in Google Looker Studio
- I'm trying to connect AWS RDS to "looker studio", but I keep getting errors... I can connect to tableau and other places
- Looker Studio - Need to verify setup of filtering out traffic that selects a specific external link
- Is it possible to integrate Looker Studio with websites without keeping it public, to preserve data?
- Can I use a drop-down list to switch between the input data metric in a chart?
- Looker P&L building table
- Show count of past due items on Looker Studio Scorecard
- Use hard coded dates to filter report
- Can't mix metrics (aggregated values) and dimensions (non-aggregated values) in Looker Studio
- How to filter values from showing up in a Looker Studio Time Series Chart
- PrestaShop metrics definition
- Change drill down level for multiple charts at the same time
- Showing active users between dates in Looker Studio
- How to connect MySql Database using SSH to Looker Studio?
Related Questions in DATA-STUDIO-CUSTOM-VISUALS
- How do I export a dashboard in Google Looker Studio
- How to create an average chart based on another metric
- Get the Month of a week range based on which month has more dates in Data/Looker Studio
- Google data studio (Looker) string field HH:MM:SS changed to a duration/ number that allows me to use it in a SUM
- Row level security in looker studio
- Not receiving dateRange objects via DSCC
- Is it possible to create a select all checkbox in the SELECT_MULTIPLE configuration object in Looker Studio connector?
- Looker Studio custom visualization using Google Charts results in empty page
- How to use Data Studio bindings in a Vega chart code table?
- Need to create conditional stacked bar chart in Google Data Studio
- Google Data Studio - How to embed a dashboard that the user can only see the embedded dashboard and not go to the Data Studio page?
- Is there a way to trigger a dataset refresh on a datastudio Report?
- Merge two(or multiple) Google Ads accounts to blend with another data source
- Data studio filter - some of String data converting to date range automatically
- Google Data Studio Custom dimension showing incorrect data
Popular Questions
- How do I undo the most recent local commits in Git?
- How can I remove a specific item from an array in JavaScript?
- How do I delete a Git branch locally and remotely?
- Find all files containing a specific text (string) on Linux?
- How do I revert a Git repository to a previous commit?
- How do I create an HTML button that acts like a link?
- How do I check out a remote Git branch?
- How do I force "git pull" to overwrite local files?
- How do I list all files of a directory?
- How to check whether a string contains a substring in JavaScript?
- How do I redirect to another webpage?
- How can I iterate over rows in a Pandas DataFrame?
- How do I convert a String to an int in Java?
- Does Python have a string 'contains' substring method?
- How do I check if a string contains a specific word?
Popular Tags
Trending Questions
- UIImageView Frame Doesn't Reflect Constraints
- Is it possible to use adb commands to click on a view by finding its ID?
- How to create a new web character symbol recognizable by html/javascript?
- Why isn't my CSS3 animation smooth in Google Chrome (but very smooth on other browsers)?
- Heap Gives Page Fault
- Connect ffmpeg to Visual Studio 2008
- Both Object- and ValueAnimator jumps when Duration is set above API LvL 24
- How to avoid default initialization of objects in std::vector?
- second argument of the command line arguments in a format other than char** argv or char* argv[]
- How to improve efficiency of algorithm which generates next lexicographic permutation?
- Navigating to the another actvity app getting crash in android
- How to read the particular message format in android and store in sqlite database?
- Resetting inventory status after order is cancelled
- Efficiently compute powers of X in SSE/AVX
- Insert into an external database using ajax and php : POST 500 (Internal Server Error)
Issue Identification
Was able to replicate the issue. Currently it seems that the values
2-5and6-10were automatically detected as Date values in Google Sheets (notice that Dates are right aligned as opposed to Plain Text values which are left aligned in Google Sheets).Suggestion
In Google Sheets, select the column and set the format to
Plain Textand refresh the Google Data Studio Report to view the refreshed data showing the values as expected.Editable Google Data Studio Report and a GIF to elaborate: